MVM Prime 5000

MVM Prime 5000 is a two-component, 100% solids epoxy moisture barrier system designed to effectively halt moisture vapor-related issues on concrete before the installation of SpecChem underlayments or overlayments. It also provides an excellent bond to concrete and can be applied to concrete as early as 5 days old, where early application of floor covering is essential.

  • One-coat epoxy system that is easy to spread and provides excellent coverage.
  • VOC compliant with zero grams per liter VOC.
  • Reduces moisture vapor for floor coverings and has an ASTM E 96 rating of 0.06 perms at 14 mils.
  • Provides excellent bond strength to concrete.

Coverage

  • Coverage rate is approximately 75-125 sq-ft per gallon. The concrete surface texture greatly affects coverage rates and final appearance.
  • Material Requirements: A one coat application using a cover age rate of 110 sq-ft per gallon per coat, will create a 14.5 mil coating.

Packaging

  • 3 gallon units (2 -1 gal. Part A & 1-gal. Part B)
  • 15 gallon units (2 – 5 gal pails Part A, 1- 5 gal Part B)

Shelf Life

The shelf life of properly stored MVM PRIME 5000 is two years from date of manufacture. Store MVM PRIME 5000 in its original containers and keep tightly closed in a cool, dry area. Do not allow the accumulation of water, dirt or other contaminants. Do not leave containers exposed to sun. Keep from freezing. Keep away from heat.

Standards

  • USDA accepted
  • Prevents moisture-related problems with floor coverings over concrete floors.
  • Serves as an excellent primer for SpecChem Underlayments/Overlayments.

Concrete Surface Preparation:

  • New concrete must be at least 5 days old with all curing compounds and sealers removed, and possess a minimum tensile strength of 150 psi.
  • Existing concrete must be clean, dry, and sound. Remove all contaminants such as oil, dirt, and unsound concrete.
  • Concrete surfaces must be mechanically prepared to a minimum ICRI CSP of 3. Acid etching is not acceptable.

Mixing:

  • Condition all materials to a temperature range of 65°F to 85°F.
  • Mix Parts A and B separately for one minute using a drill and mixing prop, then combine and mix for an additional 3 minutes to ensure proper chemical reaction.

Placement:

  • Spread with a squeegee or notched squeegee and back-roll with a roller to improve bond and reduce surface imperfections.
  • While still fresh, broadcast clean/dry sand over the application to create an ideal bonding surface for underlayment or overlayment systems.
Mix Ratio 2-to-1 mix ratio
Permeability
ASTM E96
0.06 perms @ 14 mils
Viscosity Approx. 250 cps
Working Time 20 minutes
Walkable 4 hours @ 75°F
Install Underlayment of Topping Min. 4 hours

Coverage

  • Coverage rate is approximately 75-125 sq-ft per gallon. The concrete surface texture greatly affects coverage rates and final appearance.
  • Material Requirements: A one coat application using a cover age rate of 110 sq-ft per gallon per coat, will create a 14.5 mil coating.

Packaging

  • 3 gallon units (2 -1 gal. Part A & 1-gal. Part B)
  • 15 gallon units (2 – 5 gal pails Part A, 1- 5 gal Part B)

Shelf Life

The shelf life of properly stored MVM PRIME 5000 is two years from date of manufacture. Store MVM PRIME 5000 in its original containers and keep tightly closed in a cool, dry area. Do not allow the accumulation of water, dirt or other contaminants. Do not leave containers exposed to sun. Keep from freezing. Keep away from heat.

Standards

  • USDA accepted
  • Prevents moisture-related problems with floor coverings over concrete floors.
  • Serves as an excellent primer for SpecChem Underlayments/Overlayments.

Concrete Surface Preparation:

  • New concrete must be at least 5 days old with all curing compounds and sealers removed, and possess a minimum tensile strength of 150 psi.
  • Existing concrete must be clean, dry, and sound. Remove all contaminants such as oil, dirt, and unsound concrete.
  • Concrete surfaces must be mechanically prepared to a minimum ICRI CSP of 3. Acid etching is not acceptable.

Mixing:

  • Condition all materials to a temperature range of 65°F to 85°F.
  • Mix Parts A and B separately for one minute using a drill and mixing prop, then combine and mix for an additional 3 minutes to ensure proper chemical reaction.

Placement:

  • Spread with a squeegee or notched squeegee and back-roll with a roller to improve bond and reduce surface imperfections.
  • While still fresh, broadcast clean/dry sand over the application to create an ideal bonding surface for underlayment or overlayment systems.
Mix Ratio 2-to-1 mix ratio
Permeability
ASTM E96
0.06 perms @ 14 mils
Viscosity Approx. 250 cps
Working Time 20 minutes
Walkable 4 hours @ 75°F
Install Underlayment of Topping Min. 4 hours