SpecPlate Floor Topping

SpecPlate Floor Topping is an industrial metallic aggregate floor topping which provides heavy duty abrasion and impact resistance to existing or new concrete floors.
SpecPlate Floor Topping combines clean, graded, iron aggregate with special cements and admixtures to increase abrasion resistance.

  • High wear/abrasive resistance up to eight times more than plain concrete
  • Dense surface resists penetration of oil grease and many industrial chemicals
  •  High strength with more than twice the impact resistance of plain concrete
  • Lower maintenance costs through reduced absorption
  • High/early strength for minimal downtime and faster floor turn around

Packaging

  • 50 lb triple lined bag
  • 3000 lb super sacks

Shelf Life

Shelf life of unopened bags stored in a dry facility is 12 months. Excessive temperature differential and/or high humidity can shorten the shelf life expectancy. Store in a cool, dry area away from direct sunlight.

Standards

Metallic Floor Topping: Areas subjected to severe abrasion, impact and heavy loads will have a heavy duty metallic floor topping applied as noted. Floor topping shall be free of rust, oil and non-ferrous metals and can be applied up to 2” thick.

Approved product: SpecPlate Floor Topping.

  • Ensure the workspace is under roof and controlled interior conditions are met.
  • Surface preparation should be done using a scarifier, shot blasting, or milling machine to achieve a Concrete Surface Profile (CSP) of #7-8.
  • Prime surfaces with SpecPoxy 1000 to ensure uniform bonding, applying at 75-100 sq. ft. per gallon using a notched squeegee, broom, or roller.

Mixing and Placing:

  • Use a paddle mixer, adding about 85% of the required water for a batch of 3-4 bags. Add SpecPlate Floor Topping and mix for around 2 minutes before adding the remaining water to reach a 5″ to 6″ slump.
  • Place the mixed topping over the tacky epoxy bond coat, screed, and bull float to the correct elevation, and apply SpecFilm to prevent rapid drying.

Finishing:

  • Float the surface once it can support the weight of a power float. Use steel trowels for finishing, taking care not to overwork the surface. Blisters indicate premature troweling.

Curing:

  • After finishing, mist the surface with water and cover with polyethylene sheeting for at least seven days.
Compressive Strength
ASTM C-109
24 Hours 5,000 psi
3 Days 7,000 psi
7 Days 8,500 psi
28 Days 12,000 psi
Coverage Rates
0.75″ Topping 13.5 lbs. per sq. ft.
1″ Topping 18 lbs. per sq. ft.
2″ Topping 37 lbs. per sq. ft.
Yield Approximately 0.23–0.25 cubic feet per 50 lb. bag.

Packaging

  • 50 lb triple lined bag
  • 3000 lb super sacks

Shelf Life

Shelf life of unopened bags stored in a dry facility is 12 months. Excessive temperature differential and/or high humidity can shorten the shelf life expectancy. Store in a cool, dry area away from direct sunlight.

Standards

Metallic Floor Topping: Areas subjected to severe abrasion, impact and heavy loads will have a heavy duty metallic floor topping applied as noted. Floor topping shall be free of rust, oil and non-ferrous metals and can be applied up to 2” thick.

Approved product: SpecPlate Floor Topping.

  • Ensure the workspace is under roof and controlled interior conditions are met.
  • Surface preparation should be done using a scarifier, shot blasting, or milling machine to achieve a Concrete Surface Profile (CSP) of #7-8.
  • Prime surfaces with SpecPoxy 1000 to ensure uniform bonding, applying at 75-100 sq. ft. per gallon using a notched squeegee, broom, or roller.

Mixing and Placing:

  • Use a paddle mixer, adding about 85% of the required water for a batch of 3-4 bags. Add SpecPlate Floor Topping and mix for around 2 minutes before adding the remaining water to reach a 5″ to 6″ slump.
  • Place the mixed topping over the tacky epoxy bond coat, screed, and bull float to the correct elevation, and apply SpecFilm to prevent rapid drying.

Finishing:

  • Float the surface once it can support the weight of a power float. Use steel trowels for finishing, taking care not to overwork the surface. Blisters indicate premature troweling.

Curing:

  • After finishing, mist the surface with water and cover with polyethylene sheeting for at least seven days.
Compressive Strength
ASTM C-109
24 Hours 5,000 psi
3 Days 7,000 psi
7 Days 8,500 psi
28 Days 12,000 psi
Coverage Rates
0.75″ Topping 13.5 lbs. per sq. ft.
1″ Topping 18 lbs. per sq. ft.
2″ Topping 37 lbs. per sq. ft.
Yield Approximately 0.23–0.25 cubic feet per 50 lb. bag.