Duo Patch

Duo Patch is a two-component, polymer-modified concrete repair mortar, enriched with an integral corrosion inhibitor. It’s designed for a variety of applications including horizontal, form and pour, and vertical and overhead when mixed to a stiffer consistency. Duo Patch is particularly effective in industrial settings such as warehouses, parking decks, and roadways, offering superior durability under heavy loads and abrasion.

  • Contains integral corrosion inhibitor
  • Suitable for repairs from featheredge to 2”
  • Interior/Exterior overlayment applications
  • Excellent freeze-thaw durability and adhesion
  • Easy to trowel high slump consistency
  • Dries to natural concrete gray color

Packaging

  • 50 lb bag of Duo Patch + 1 gal. jug of DUO PATCH Ad mix
  • 60 lb pail unit containing 50 lb bag of DUO PATCH + 1 gal. jug of DUO PATCH Admix

Shelf Life

Shelf life of unopened bags stored in a dry facility is 12 months. Excessive temperature differential and/or high humidity can shorten the shelf life expectancy. Store in a cool, dry area away from direct sunlight. Do not allow the DUO PATCH Admix to freeze!

Surface Preparation

  • Ensure Cleanliness: The concrete must be clean and free from oil, grease, dust, laitance, or any surface contaminants. Mechanically abrade the surface to a minimum Concrete Surface Profile (CSP) of 3 as per ICRI 310.2 standards.
  • Create Notched Edges: For enhanced durability in heavy load or high traffic applications, saw cut a ¼” recess around the perimeter of the patch, forming a thickened edge.
  • Moisture Condition: The concrete surface must be saturated-surface-dry (SSD) with no standing water present.
  • Steel Reinforcement Cleaning: Remove rust from all exposed steel reinforcing and apply SpecPrep SB as a protective coating.
  • Priming: Apply SpecPrep SB to SSD concrete via spray or brush, ensuring the repair mortar is applied wet on wet or within the open time specified in the SpecPrep SB datasheet. Alternatively, use a scrub coat of mixed repair mortar, ensuring it is placed before the bond coat dries.

Mixing and Application

  • Measure 7.0 to 7.5 pints of Duo Patch Admix per 50-pound bag, adjusting based on desired consistency.
  • Use a low-speed drill for mixing. Begin with the Admix, then gradually add the Duo Patch powder, mixing for 2-3 minutes until homogeneous. Do not mix more material than can be used within the product’s setting time.
  • For repairs up to 1” thick, apply Duo Patch directly. Do not exceed 7 pints of Admix for depths over 1/2″.
  • For larger repairs over 1”, extend Duo Patch with up to 60% by weight (30 lbs) of clean, SSD 3/8″ aggregate, mixing for an additional 2 minutes. This mix should be placed within 15-20 minutes.

Placement Procedure

Apply Duo Patch into the prepared area with a trowel, screed, or pour, ensuring full contact and integration with the surface. For a level finish, screed Duo Patch flush with the surrounding concrete.

Finishing/Curing

After initial set, when Duo Patch is firm, finish with a hand trowel to match the surrounding concrete texture. Use SpecChem IntraFilm as a finishing aid if needed. Under most conditions, Duo Patch is self-curing. In extreme conditions, apply an ASTM C309 compliant SpecChem water-based curing compound.

Set Time at 70°F
ASTM C266
Initial set time: 40 minutes
Final set time: 50 minutes
Compressive Strength
ASTM C109
1 day: 2,500 psi
7 days: 4,000 psi
28 days: 6,000 psi
Bond Strength
ASTM C882 modified
7 days: 1,800 psi
Length Change
ASTM C157
Wet cure at 28 days: +0.04%
Air cure at 28 days: -0.02%
Flexural Strength
ASTM C348
7 days: 650 psi
28 days: 1,300 psi
Yield Each bag yields approximately 0.42 cubic feet.

Packaging

  • 50 lb bag of Duo Patch + 1 gal. jug of DUO PATCH Ad mix
  • 60 lb pail unit containing 50 lb bag of DUO PATCH + 1 gal. jug of DUO PATCH Admix

Shelf Life

Shelf life of unopened bags stored in a dry facility is 12 months. Excessive temperature differential and/or high humidity can shorten the shelf life expectancy. Store in a cool, dry area away from direct sunlight. Do not allow the DUO PATCH Admix to freeze!

Surface Preparation

  • Ensure Cleanliness: The concrete must be clean and free from oil, grease, dust, laitance, or any surface contaminants. Mechanically abrade the surface to a minimum Concrete Surface Profile (CSP) of 3 as per ICRI 310.2 standards.
  • Create Notched Edges: For enhanced durability in heavy load or high traffic applications, saw cut a ¼” recess around the perimeter of the patch, forming a thickened edge.
  • Moisture Condition: The concrete surface must be saturated-surface-dry (SSD) with no standing water present.
  • Steel Reinforcement Cleaning: Remove rust from all exposed steel reinforcing and apply SpecPrep SB as a protective coating.
  • Priming: Apply SpecPrep SB to SSD concrete via spray or brush, ensuring the repair mortar is applied wet on wet or within the open time specified in the SpecPrep SB datasheet. Alternatively, use a scrub coat of mixed repair mortar, ensuring it is placed before the bond coat dries.

Mixing and Application

  • Measure 7.0 to 7.5 pints of Duo Patch Admix per 50-pound bag, adjusting based on desired consistency.
  • Use a low-speed drill for mixing. Begin with the Admix, then gradually add the Duo Patch powder, mixing for 2-3 minutes until homogeneous. Do not mix more material than can be used within the product’s setting time.
  • For repairs up to 1” thick, apply Duo Patch directly. Do not exceed 7 pints of Admix for depths over 1/2″.
  • For larger repairs over 1”, extend Duo Patch with up to 60% by weight (30 lbs) of clean, SSD 3/8″ aggregate, mixing for an additional 2 minutes. This mix should be placed within 15-20 minutes.

Placement Procedure

Apply Duo Patch into the prepared area with a trowel, screed, or pour, ensuring full contact and integration with the surface. For a level finish, screed Duo Patch flush with the surrounding concrete.

Finishing/Curing

After initial set, when Duo Patch is firm, finish with a hand trowel to match the surrounding concrete texture. Use SpecChem IntraFilm as a finishing aid if needed. Under most conditions, Duo Patch is self-curing. In extreme conditions, apply an ASTM C309 compliant SpecChem water-based curing compound.

Set Time at 70°F
ASTM C266
Initial set time: 40 minutes
Final set time: 50 minutes
Compressive Strength
ASTM C109
1 day: 2,500 psi
7 days: 4,000 psi
28 days: 6,000 psi
Bond Strength
ASTM C882 modified
7 days: 1,800 psi
Length Change
ASTM C157
Wet cure at 28 days: +0.04%
Air cure at 28 days: -0.02%
Flexural Strength
ASTM C348
7 days: 650 psi
28 days: 1,300 psi
Yield Each bag yields approximately 0.42 cubic feet.